Case Study

Situation:

Burns & McDonnell engaged SKC Communications in an design and build agreement in October of 2014. They were expanding their World Headquarters and wanted to utilize SKC for the AV services of the new building. The design phase lasted roughly 18 months before the on-site portion of the work started.

Solution:

SKC Communications provided all the AV service of the new building. This building consisted of conference rooms, an auditorium, and lobby. The auditorium features a 5×5 Planar video wall.

Results:

We designed and implemented over 80 breakout conference rooms with displays, Crestron Digital Media and Microsoft USB cameras. There were 15 open conference areas with display technology and Crestron scalers, 6 fully integrated executive conference spaces with Crestron control systems, and Biamp audio processors. We deployed custom Leon speakers throughout the space for aesthetics and Polycom Video conference in specific areas. The focal point of the project was the auditorium where we installed a 5×5 Planar video wall fully controlled via Crestron. The lobby also has 1×3 Planar video walls. Burns & McDonnell is now equipped as a World Headquaters facility.

Printable Case Study